Method / Stage gates
A programme moves through six stages. Each ends in a gate with a plain test: can the next team rely on what was produced?
01
Turn a broad ambition into a question that can be answered with a measurement.
Outputs
Risks
02
Build the simplest model that could be wrong in an informative way.
Outputs
Risks
03
Make the smallest physical artefact that can test the riskiest assumption.
Outputs
Risks
04
Decide what to measure, at what rate and with what uncertainty — before the test.
Outputs
Risks
05
Compare prediction with measurement, with the scatter of the measurement known.
Outputs
Risks
06
Pass on what is known, what is assumed and what still needs real-world verification.
Outputs
Risks
Every model leaves something out. The useful ones say what, and how large the omission might be.
Acceptance criteria written before the test cannot be quietly adjusted to fit the result.
Filtered and validated channels are derived, never substituted. Every change is logged.